- Basement waterproofing
- Water proofing of cut and cover tunnels, subways, metros, caves.
- Other underground public constructions
- For waterproofing and protection of slabs and confined walls below ground
- Prevent coal gas, marsh gas, methane leakage in underground layer
- Resistant to seawater, chlorides and alkali
- Chemical Stability against common organic and inorganic acids, alkalis, salts and organic solvents
- Saving cost and time
- No protection layer required
- Fast installation
- Excellent waste management
- Anti sedimentation and anti-cracking
- Provides complete barrier to water, moisture and gas
- Cold applied, easy to install, does not require primer or fillet
- Solar reflective, being white in colour thereby reduce temperature gain
- Smooth surface membrane
- Seals adhesively to concrete
- Highly chemical resistant, effective in all types of soils and waters, protects structure from chlorides, sulphates and aggressive ground condition
- Excellent bonding with concrete applied on membrane
- Low flatness requirement to substrate; reliable overlapping; mechanical fixing, easy application
- Sound anti-puncture performance and adaptable to settlement and distortion
Installation – General Guidelines
- Tools/materials required: Heavy duty lap roller, stanley/utility knives, tape measure, cotton cleaning cloths, plywood, or similar cutting board, thin metal straight edge, chalk line, broom, 2 metre long pipe, or heavy broom handle, round nose trowel, or spatula required protection and/or drainage boards and other ancillary products.
- SUNPRUFE membranes are supplied in rolls 1.2 m wide incorporating dual adhesive layers with colored zip strips at the top and bottom of the seam area on the edge of the roll. This enables even stronger bonded laps between adjacent rolls. Both zip strips cover an aggressive adhesive. Once the zip strip on the top of the membrane and the zip strip on the bottom of the membrane are removed, a strong adhesive to adhesive bond is achieved in the overlap area.
Installation – Horizontal Surface
- Place the membrane with the zip strip facing towards the concrete pour. Kick out or roll out the membrane with HDPE film side to the substrate. End laps should be staggered to avoid a build-up of layers. Leave zip strips on the membrane until overlap procedure is completed.
- Accurately position succeeding sheets to overlap the previous sheet 3 in. (75 mm) along the marked edge. Peel back and remove both the zip strips in the overlap area to achieve an adhesive to adhesive bond at the overlap. Ensure a continuous bond is achieved without creases and roll firmly with a heavy roller.
- On completion of the installation, ensure complete removal of the plastic zip strips from all overlaps.
Installation – Vertical Surface
- Apply the membrane with the green zip strip facing towards the concrete pour. Mechanically fasten the membrane vertically using flat-headed fixings appropriate to the substrate.
- The membrane may be installed in any convenient length. Secure the top of the membrane using a batten or fixing 50 mm below the top edge. Use fixings at typically 600 mm centres to secure the membrane flat against the substrate.
- Fixings can be made through the selvedge, this allows firmly rolled overlaps, which are covered by the subsequent strip of SUNPRUFE.
- Peel back and remove both the green and blue zip strips in the overlap area to achieve an adhesive to adhesive bond at the overlap. Ensure a continuous bond is achieved without creases and roll firmly. On completion of the installation, completely remove the plastic zip strips from all overlaps.
Corners
- Internal and external corners should be membrane a minimum of 100 mm and sealing. Ensure that the apex of the corner is covered and sealed and roll firmly.